PHELAN, Calif. — A proposed 1.5-million-gallon water storage reservoir could give the Phelan Piñon Hills Community Services District more flexibility to maintain supply and support firefighting needs in the High Desert.
The district’s official project list identifies Reservoir 6A-2 as a proposed additional storage tank alongside its existing Reservoir 6A. The project aims to improve the reliability of the district’s water supply, allow existing equipment to be taken offline for maintenance and reduce electricity use for pumping during peak demand.
Where will the reservoir go?
State environmental documents describe a reservoir at the existing district-owned Reservoir 6A site, involving assessor parcel numbers 3037-071-06 and 3037-071-08. The proposed expansion would be installed within a project site of approximately one acre, with no modification to the existing 0.4-million-gallon tank contemplated in the initial description.
The environmental filing is available through the California State Clearinghouse, project number 2024050164.
How much funding is listed?
The district identifies a $2 million grant from the U.S. Department of Housing and Urban Development for the project. Its project page gave an estimated completion window of 2025–2026.
An estimated deadline is not proof that the reservoir is finished or operating. The materials reviewed for this article establish the planning purpose and grant listing, but not a final acceptance certificate, commissioning date or a current water-quality result.
Why does the project matter?
Large local storage capacity can help the district manage daily demand, repairs and emergency water needs in a region with long distances between infrastructure and limited backup alternatives. Residents seeking current construction or commissioning information should ask the district’s engineering staff for the latest board reports.
District contact: pphcsd.specialdistrict.org, telephone 760-868-1212.
Illustrative photograph: Chad Nathan / Unsplash. This water tower is not Reservoir 6A-2.
Sources: PPHCSD project list and grant summary; California State Clearinghouse — Reservoir 6A-2 environmental review.
Support Phelan News
Choose how to support Phelan News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Phelan News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Phelan News
- Phelan Police Pursuit Ends in Parked-Car Crash; Driver Arrested on Drug and Evasion Suspicions →
- Phelan’s 32nd Veterans Dinner: Students Serve Military Veterans at Serrano High School →
- Phelan Farmers Market Listed for November 9; County Calendar Shows Conflicting Winter Closing Times →
- Phelan–Piñon Hills CSD: Covington, Minnala and Sanchez Lead Three-Director Election →
- Phelan’s Community Services District Publishes Its Approved 2026–27 Budget and 2025 Audit Documents →

COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.